How to Finance a Subdivision Development

How to Finance a Subdivision Development

Subdivision development financing requires 25-35% down with rates from 7.5-12%. Learn loan types, draw schedules, and requirements to fund your next project.

Updated February 12, 2026

Recently Funded
Cash-Out Refinance

$5.3M Industrial Warehouse

Birmingham, AL

Subdivision development financing is one of the most specialized areas of commercial lending, combining land acquisition, infrastructure construction, and phased disbursements into a single loan structure. Whether you are planning a 10-lot infill project or a 200-lot master-planned community, understanding how these loans work is the first step to getting your project funded and built.

In 2026, the financing landscape for subdivision developers continues to evolve. Interest rates for land development loans averaged 11.77% in the second quarter of 2025, and while the Federal Reserve's rate cuts in late 2025 have begun easing borrowing costs, developers still need strong fundamentals, experienced teams, and well-structured deals to secure capital. The good news is that demand for finished lots remains robust, and lenders are actively competing for quality subdivision projects.

This guide breaks down everything you need to know about financing a subdivision development, from loan types and requirements to draw schedules and timelines.

Need Financing for This Project?

Stop searching bank by bank. Get matched with 6,000+ vetted lenders competing for your deal.

If you are planning a subdivision project and want to explore your financing options, reach out to Clearhouse Lending for a consultation. Our team specializes in horizontal construction loans and can help you structure the right financing for your development.

How Does Subdivision Development Financing Work?

Subdivision development financing provides capital for acquiring raw or partially entitled land and converting it into finished, buildable lots. The loan typically covers land acquisition costs, engineering and permitting expenses, and all horizontal construction work including grading, roads, utilities, drainage, and landscaping.

Unlike a standard commercial mortgage, subdivision development loans are disbursed in phases through a draw schedule. The lender releases funds as the developer completes specific milestones, such as finishing the grading or installing water and sewer lines. This structure protects both the lender and the borrower by ensuring money is spent on verified, completed work.

Most subdivision loans fall under the category of Acquisition, Development, and Construction (AD&C) financing. According to the FDIC's supervisory guidelines, lenders can extend up to 75% loan-to-value for land development loans, though many lenders set their own, often more conservative, thresholds. The developer funds the remaining equity through cash, land equity, or a combination of both.

The loan term for a subdivision development project is typically 12 to 36 months, though larger master-planned communities may require extensions or phased financing. Interest is usually charged only on drawn funds, which helps manage carrying costs during the early stages of development.

What Are the Requirements for a Subdivision Construction Loan?

Qualifying for a subdivision construction loan requires meeting both personal financial thresholds and project-level criteria that demonstrate the deal is viable. Lenders evaluate the borrower, the project, and the market before issuing a commitment.

On the borrower side, you will typically need a credit score of 680 or higher, a net worth at least equal to the loan amount, liquidity reserves covering 10-20% of the loan, and a track record of completing similar projects. First-time developers can still qualify, but they may face higher down payment requirements and will likely need an experienced partner or general contractor on the team.

For the project itself, lenders want to see a detailed scope of work with engineering plans, all necessary entitlements and permits (or a clear path to obtaining them), a market study or absorption analysis showing demand for the lots, and a realistic budget backed by contractor bids.

Environmental assessments are also required in most cases. A Phase I Environmental Site Assessment (ESA) is standard, and if any concerns are identified, a Phase II ESA with soil sampling may follow. Wetlands delineation, traffic studies, and geotechnical reports may also be needed depending on the site.

The lender will commission an independent appraisal that values the land both "as-is" and in its projected "as-completed" state with finished lots. The loan amount is typically based on the lower of these two valuations or the actual project cost.

How Much Does It Cost to Develop a Subdivision?

The total cost to develop a subdivision varies widely depending on location, lot count, topography, and the extent of infrastructure required. However, most developers can expect to spend between $25,000 and $75,000 per lot for horizontal development alone, with costs running significantly higher in areas with challenging terrain or extensive utility requirements.

According to data from the NAHB Cost of Construction Survey, the finished lot represented 13.7% of the average new home sales price in 2024, which translates to roughly $91,000 per lot based on an average sales price of $665,298. That figure includes both the raw land value and all development costs.

Breaking down the typical horizontal development budget, the major cost categories include site grading and earthwork (15-20% of the budget), roads and paving (20-25%), water and sewer infrastructure (20-30%), storm drainage systems (10-15%), electrical and communications utilities (5-10%), and soft costs like engineering, permitting, and legal fees (10-15%).

Other costs that developers often underestimate include impact fees charged by municipalities (which can range from $5,000 to $30,000 or more per lot), performance bonds, wetland mitigation, and temporary erosion control measures. It is critical to build a 10-15% contingency into your budget to account for unforeseen conditions.

Use our commercial mortgage calculator to estimate your monthly interest costs based on your projected loan amount and draw schedule.

What Types of Loans Are Available for Subdivision Development?

Several loan products can be used to finance a subdivision, each suited to a different stage of the development process or borrower profile. Understanding your options allows you to choose the right structure and potentially save significant money over the life of your project.

Acquisition and Development (A&D) Loans are the most common choice for subdivision developers. These loans combine land purchase and infrastructure construction into a single facility, with funds disbursed through a draw schedule as work progresses. A&D loans typically offer 65-75% LTV and terms of 18-36 months.

Land Acquisition Loans cover only the purchase of the raw land, with separate financing arranged later for development. These are useful when you need to lock up a site quickly but are not yet ready to begin construction. LTV ratios for raw land loans are lower, generally 50-65%. Read more about this approach in our land acquisition financing guide.

Horizontal Construction Loans focus specifically on the infrastructure development phase. If you already own the land free and clear, a horizontal construction loan allows you to borrow against the land equity to fund grading, roads, and utilities. These loans may offer more favorable terms since the land serves as built-in equity.

Bridge Loans can fill short-term gaps in the financing timeline, such as covering costs while waiting for entitlements or providing additional capital between development phases. Bridge loan programs are typically interest-only with terms of 6-24 months.

For larger projects, some developers layer multiple loan products together. For example, a developer might use a bridge loan to acquire the land, refinance into an A&D loan once entitlements are secured, and then arrange individual vertical construction loans for the homes built on the finished lots.

What Down Payment Do You Need for Subdivision Financing?

Most subdivision development loans require a down payment of 25-35% of the total project cost, making it one of the most equity-intensive forms of commercial lending. The exact requirement depends on the borrower's experience, the project's risk profile, and the lender's underwriting standards.

The FDIC recommends a maximum 75% LTV for land development loans, which translates to a minimum 25% equity contribution. However, many lenders require 30-35%, particularly for speculative projects where lots will be sold to multiple builders rather than being developed by a single, contracted builder.

There are several ways to meet the equity requirement beyond a straight cash injection. If you already own the land, the appraised value of that land can count toward your equity contribution. For example, if you purchased a parcel for $500,000 two years ago and it now appraises at $750,000, that $250,000 in equity appreciation can reduce or eliminate the additional cash needed at closing.

Other acceptable equity sources include seller financing on the land (with lender approval), personal assets pledged as additional collateral, profits from presold lots or builder deposits, and partner equity from joint venture agreements. Each lender will have specific guidelines on what qualifies as acceptable equity, so discuss your situation early in the process.

Looking to see how different equity levels affect your loan terms? Try our commercial bridge loan calculator to run scenarios based on your project numbers.

How Long Does the Subdivision Financing Process Take?

The timeline for securing subdivision development financing typically ranges from 60 to 120 days from initial application to closing, though the actual duration depends on the complexity of the project and the completeness of your loan package. Being well-prepared with documentation can shave weeks off the process.

The loan process generally follows a predictable sequence. The first two to four weeks involve the initial application, preliminary underwriting, and a term sheet or letter of intent from the lender. The next four to six weeks cover formal underwriting, third-party reports (appraisal, environmental, survey), and title work. The final two to four weeks involve loan documentation, legal review, and closing.

Several factors can extend the timeline significantly. If entitlements and permits are not yet in hand, most lenders will not close until they are secured, which can add months to the process. Similarly, environmental issues discovered during the Phase I ESA, title defects, or incomplete engineering plans can cause delays.

To accelerate the process, submit a complete loan package from the start. This should include your project pro forma, detailed construction budget, contractor information, market analysis, personal financial statements, and at least two years of tax returns. The more questions you can answer upfront, the faster the underwriting team can move.

Ready to start the process? Contact Clearhouse Lending to discuss your subdivision project with an experienced lending advisor.

What Makes a Subdivision Project Bankable?

A "bankable" subdivision project is one that a lender can underwrite with confidence, knowing that the finished lots will sell at prices and volumes that support loan repayment. Several key factors determine bankability, and addressing them proactively will strengthen your loan application.

Market demand is the single most important factor. Lenders want to see evidence that builders or homebuyers are actively purchasing lots in the area at prices consistent with your pro forma. A formal market study or absorption analysis from a third-party firm carries significant weight. Pre-sale agreements or letters of intent from builders are even more compelling.

Location and infrastructure access matter enormously. Sites with existing road access, nearby utility connections, and favorable zoning are far easier to finance than remote parcels requiring extensive off-site improvements. The cost and timeline for connecting to municipal water and sewer can make or break a project's feasibility.

Developer experience is heavily scrutinized by lenders. Having completed two or more similar projects gives you credibility and often results in better loan terms. If you are a first-time developer, consider partnering with an experienced developer or hiring a seasoned project manager to strengthen the application.

Financial feasibility must be demonstrated through a detailed pro forma showing realistic lot sale prices, development costs backed by actual bids, and a healthy profit margin. Most lenders want to see a minimum profit margin of 15-20% on the total project. The pro forma should also include sensitivity analysis showing the project remains viable even if lot prices decrease by 10-15% or the timeline extends by six months.

For a deeper understanding of how horizontal and vertical components interact, read our guide on horizontal vs vertical construction loans.

How Do Draw Schedules Work for Subdivision Loans?

A draw schedule is the mechanism by which the lender disburses loan funds throughout the construction process. Rather than receiving the entire loan amount at closing, the developer submits draw requests at predetermined milestones, and the lender releases funds after verifying the work has been completed.

For subdivision development, a typical draw schedule includes five to eight phases, each tied to a specific construction milestone. The lender sends an inspector to the site before each draw to confirm that the work meets specifications and that the percentage of completion matches the draw request. This inspection process usually takes three to seven business days.

Most lenders retain 5-10% of each draw as a holdback or retainage, which is released upon final completion and acceptance of all improvements. This ensures the developer has an incentive to finish the project and provides a buffer for any punch-list items or corrections.

Interest on a subdivision development loan accrues only on the funds that have been drawn, not the full loan commitment. This is a significant advantage during the early stages of development when only a fraction of the total loan has been disbursed. As construction progresses and more funds are drawn, the monthly interest payments increase proportionally.

One common issue developers face is the timing gap between paying contractors and receiving draw funds from the lender. Most contractors expect payment within 30 days of completing their work, but the draw request and inspection process can take two to three weeks. Maintaining adequate working capital to bridge this gap is essential for keeping the project on schedule.

For more on how construction loan financing structures work, check out our construction loan interest rate guide and our ground-up development financing guide.

Frequently Asked Questions

Can I finance a subdivision with no money down?

True zero-down subdivision financing is extremely rare. However, if you own the land free and clear and its appraised value equals or exceeds the lender's equity requirement (typically 25-35% of total project cost), you may not need additional cash at closing. Some developers also use seller financing, joint venture partnerships, or mezzanine debt to reduce their out-of-pocket cash contribution. The land equity effectively serves as your down payment in these structures.

What credit score do I need for a subdivision development loan?

Most lenders require a minimum credit score of 680 for subdivision development loans, though scores of 720 or higher will help you qualify for better rates and terms. Credit score is just one factor in the underwriting decision. Lenders also evaluate your net worth, liquidity, development experience, and the overall project feasibility. A strong project with experienced sponsors can sometimes offset a borderline credit score.

How are subdivision development loans different from regular construction loans?

Subdivision development loans (also called horizontal construction loans) finance the creation of finished lots, including grading, roads, utilities, and drainage. Regular construction loans typically finance the vertical building of structures on those lots. The key differences include higher equity requirements for subdivision loans (25-35% vs 15-25% for vertical construction), shorter typical terms, and a draw schedule tied to infrastructure milestones rather than building phases.

What happens if my subdivision does not sell as quickly as projected?

If lot sales lag behind projections, the lender may offer a loan extension (usually for a fee of 0.5-1% of the remaining balance) to give you more time to sell. However, the lender will want to understand why sales are slow and what adjustments you are making. Having a contingency plan in your original business plan, such as the ability to reduce lot prices by 10-15% and still maintain profitability, demonstrates foresight and can help you negotiate better extension terms.

Do I need entitlements before applying for a subdivision loan?

Most lenders strongly prefer that entitlements and development permits are in place before they will issue a formal loan commitment. Some lenders will issue a preliminary approval contingent on entitlements being obtained, but final closing will be delayed until the permits are secured. If you need financing specifically for the pre-entitlement phase, explore our pre-development financing guide for options tailored to that stage.

Can I use an SBA loan for subdivision development?

SBA loans, including the SBA 504 and SBA 7(a) programs, are generally not available for speculative land development or subdivision projects. SBA programs are designed for owner-occupied commercial properties, not for-sale residential development. Subdivision developers typically need to look at conventional A&D loans, private or hard money lenders, or specialized construction lending programs like those offered by Clearhouse Lending.

TOPICS

subdivision financing
construction loans
land development
horizontal construction
developer financing

Clear House Lending Team

Commercial Lending Experts

Our team of commercial lending experts brings decades of experience helping investors and developers secure the right financing for their projects.

Ready to Explore Your Options?

Connect with our team for a free consultation and personalized financing quote from our network of 6,000+ commercial lenders.

Get a Free Quote

Related Articles

View all

Commercial Loan Programs

Financing solutions for every stage of the commercial property lifecycle

Commercial financing

Ready to secure your next deal?

Fast approvals, competitive terms, and expert guidance for investors and businesses.

  • Nationwide coverage
  • Bridge, SBA, DSCR & more
  • Vertical & Horizontal Construction Financing
  • Hard Money & Private Money Solutions
  • Up to $50M+
  • Foreign nationals eligible
Chat with us